
High voltage DC lines lose about 3% per 1000km, so this project with 4300km of lines could theoretically be set up to lose 12% in losses. There’s also some experimentation with ultra high voltages that would be more efficient, but probably more complex to engineer.
He just turned off the switch in the breaker, right behind the meter. The meter itself is still hooked up, so from the power company’s perspective, he has an account and everything.
At least that’s how I read the article he wrote last year: